European public procurement and grants data from official registers · Data as of 22 November 2026; updated daily.

Grants (another site)EU institutions' tenders (another site)

Swimming pool construction tenders in the Netherlands

Swimming pool construction tenders in the Netherlands: 58 listed on GranTender since 2024; 4 open now. Buyers with the most tenders: Gemeente Utrecht (3), Gemeente Noordoostpolder (3) and Gemeente Purmerend (3); suppliers with the most contract awards: Vaessen Algemeen Bouwbedrijf B.V. (4), Hellebrekers (4) and Wind Design & Build B.V. (3). Sources: TenderNed and TED. Since 2024, 36% of contracts drew a single bid (2.3 bids on average). Data as of 22 November 2026; updated daily.

Open tenders

4

Latest tenders

Key figures

Tenders
58
Open tenders
4
Awards
35
Awarded value awarded
€162,387,540
Awarded value contract
€4,423,207
Awarded value framework ceiling
€255,000
Median contract value awarded
≈ €6,500,000
Average bids per contract
2.3
Tenders in 2025
22 0% on 2024

Median: contracts with a stated value, rounded. Average bids: contracts where the number of bids is published.

Value kinds: awarded — the value in the award decision; contract — the value of the signed or amended contract; paid — the amount actually paid; framework ceiling — the maximum of a framework agreement, given with every winner, not money spent. Different kinds are never added together.

Competition and prices

Since 2024, contracts drew 2.3 bids on average (median 3) and 36% drew a single bid — based on 22 contracts with a known number of bids. The usual procedures: restricted procedure (54%), open procedure (22%), other procedures (11%) — of 54 tenders with a stated procedure.

The most contracts went to Vaessen Algemeen Bouwbedrijf B.V. (4), Hellebrekers (4) and Wind Design & Build B.V. (3) — together 31% of all contracts.

YearContractsMedian valueMiddle half of valuesBids on averageSingle bid
All years35——2.336% (22)

Values: contracts with a stated value in EUR, each value kind on its own (awarded or contract value), approximate (±3 %). Bids: contracts of procedures with competition whose number of bids the source publishes (1–100 bids); the sources publish it for some contracts only (TED ≈ 3 in 4, Spain all, Poland about half, Italy few), so each figure states its base and is shown from 20 contracts. A contract counts in the year of its award (else of its tender). Figures as of 20 November 2026, recomputed every week.

CPV codes of this topic

  • 45212212 Construction work for swimming pool

A tender belongs here when its main CPV code starts with one of these codes; a tender without a usable CPV code (or with a general one) is matched by words of its title. A tender may belong to up to three topics.

Swimming pool construction in neighbouring countries

Today, 38 tenders in the same niche are open in neighbouring countries.

Public tenders in the EU and the EEA are open to companies from every EU and EEA country on the same terms as local ones, and to companies from countries with a procurement agreement with the EU (such as Switzerland, the United Kingdom and Ukraine) for the contracts it covers. Open means the deadline has not passed (today's date). Neighbours: countries with a land border, a fixed link or a short sea crossing.

Main CPV divisions

  • 45 Construction work 40
  • 71 Architectural, engineering and inspection services 8
  • 92 Recreational, cultural and sporting services 4
  • 50 Repair and maintenance services 2
  • 15 Food, beverages and tobacco 1

Swimming pool construction by city

Swimming pool construction in other countries

Topics in Building construction and materials

Questions and answers

Which swimming pool construction tenders in the Netherlands are open now?
4 of the 58 swimming pool construction tenders in the Netherlands listed on GranTender are open for bids. For example: Zwembad Maximapark; Exploitatiebeheersysteem voor zwembaden en sportfaciliteiten - Gemeente Midden-Groningen - 2026; Zwembad Ooigraaf.
Where can I find swimming pool construction tenders in the Netherlands?
GranTender lists them in one place, from TenderNed and TED, with their buyers, winners and contract values; 4 are open now. Search in one country at a time (the first 5 results) is free; search across all countries at once, full result lists, saved keywords with an e-mail once a week and exports come with a plan.
Who wins the most swimming pool construction tenders in the Netherlands?
By number of contracts won: Vaessen Algemeen Bouwbedrijf B.V. (4), Hellebrekers (4), Wind Design & Build B.V. (3).
Which buyers publish the most swimming pool construction tenders in the Netherlands?
By number of tenders: Gemeente Utrecht (3), Gemeente Noordoostpolder (3), Gemeente Purmerend (3).
Which CPV codes belong to “Swimming pool construction”?
45212212 Construction work for swimming pool; plus tenders without a usable CPV code whose title names the topic.
How many bids do swimming pool construction tenders in the Netherlands receive on average?
Since 2024, contracts drew 2.3 bids on average (median 3) and 36% drew a single bid — based on 22 contracts with a known number of bids.
Which procedures are used for swimming pool construction tenders in the Netherlands?
The usual procedures: restricted procedure (54%), open procedure (22%), other procedures (11%) — of 54 tenders with a stated procedure.

CPV 2008 (Regulation (EC) No 213/2008), © European Union, Publications Office — via the eForms SDK, CC BY 4.0.